C_TSCM42_65 Exam Questions
158 real C_TSCM42_65 exam questions with expert-verified answers and explanations. Page 3 of 4.
- Question #108
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order. Which BOM item category must...
- Question #109
You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning procedures?
- Question #110
The final assembly of a finished product should only be triggered when a customer order arrives. Which planning strategy for the finished product do you use?
- Question #111
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
- Question #112
What option for selecting a routing exists when creating a production order?
- Question #113
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally...
- Question #114
During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? (Choose two)
- Question #115
Which of the following properties applies to multi-site planning in SAP ECC?
- Question #116
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
- Question #117
Which of the following scheduling types can only be used within capacity planning?
- Question #118
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is t...
- Question #119
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you should be able to use a second sequence on othe...
- Question #120
Where can you define the default storage location for the material component of a production order? (Choose three)
- Question #121
Which of the following statements about the planning functions available in SAP ECC is correct?
- Question #122
Which properties does ECC Master Production Scheduling (MPS) have? (Choose three)
- Question #123
You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be the reason?
- Question #124
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC. On which specifications is the dynamic safe...
- Question #125
You want to produce a finished product only when it is requested by a customer order in make-to- order production. However, all assemblies need to be procured beforehand. How can y...
- Question #126
Which of the following requirements is supported by using process orders?
- Question #127
Which of the following consequences result when a production order is set to Technically Complete (TECO)? (Choose three)
- Question #128
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)
- Question #129
What can you use to organize material staging for production orders? (Choose three)
- Question #130
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence. What do you have to consider in this...
- Question #131
Which Customizing element controls the determination of planned costs in production orders?
- Question #132
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- Question #133
Where in the SAP ECC system can you define production versions?
- Question #134
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters u...
- Question #135
Which of the following statements regarding ATP checks in SAP ECC that are triggered from customer orders is correct?
- Question #136
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the following procu...
- Question #137
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?
- Question #138
What is SAP Solution Manager?
- Question #139
You select the master data for production orders via production versions. Which information is contained in a production version?
- Question #140
Which of the following elements can be used in a process order? (Choose three)
- Question #141
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two)
- Question #142
Which master data is necessary for the creation of material reservations for production orders?
- Question #143
Which of the following statements regarding lot size procedures is correct?
- Question #144
In which scenario will the error message shown in the attached screenshot occur?
- Question #145
What functions can you use for suboperations? (Choose two)
- Question #146
Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released?
- Question #147
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- Question #148
Which of the following efforts can be minimized using the KANBAN procedure?
- Question #149
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
- Question #150
You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-specific actual data from an external process control system to SAP...
- Question #151
Which statements regarding SAP ECC long-term planning (LTP) are correct? (Choose two)
- Question #152
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
- Question #153
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned or...
- Question #154
In which of the following objects can you activate backflushing for production orders? (Choose three)
- Question #155
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- Question #156
You want to create a new material with the following properties: the material is kept in stock, is externally procured, and is used as a component in the bills of material for vari...
- Question #157
The availability check during production order creation should use a different scope of check than during order release. How can you fulfill this requirement?