SAP
C_TSCM42_65 · Question #153
C_TSCM42_65 Question #153: Real Exam Question with Answer & Explanation
Sign in or unlock C_TSCM42_65 to reveal the answer and full explanation for question #153. The question stem and answer options stay visible for context.
Question
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists. Which of the following statements are true for the two lists at this stage? (Choose two)
Options
- AThe MRP list displays the production order.
- BThe stock/requirements list displays the production order.
- CThe stock/requirements list was updated at the precise time it was accessed.
- DThe MRP list has the status "processed".
Unlock C_TSCM42_65 to see the answer
You've previewed enough free C_TSCM42_65 questions. Unlock C_TSCM42_65 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.