C_TSCM42_65 · Question #153

A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a…

The correct answer is B. The stock/requirements list displays the production order. C. The stock/requirements list was updated at the precise time it was accessed. See the full explanation below for the reasoning.

Question

A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists. Which of the following statements are true for the two lists at this stage? (Choose two)

Options

  • AThe MRP list displays the production order.
  • BThe stock/requirements list displays the production order.
  • CThe stock/requirements list was updated at the precise time it was accessed.
  • DThe MRP list has the status "processed".

How the community answered

(20 responses)
  • A
    20% (4)
  • B
    70% (14)
  • D
    10% (2)