C_TSCM42_66 Exam Questions
115 real C_TSCM42_66 exam questions with expert-verified answers and explanations. Page 2 of 3.
- Question #51
Where can you define the valid receivers for production order costs?
- Question #52
What do you have to consider regarding consumption? (Choose two)
- Question #53
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?
- Question #54
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence. What do you have to consider in this...
- Question #55
What are the names of the objects for process integration of production orders? (Choose two)
- Question #56
You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be the reason?
- Question #57
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
- Question #58
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number i...
- Question #59
Which of the following scheduling types can only be used in capacity planning?
- Question #60
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
- Question #61
Which of the following master data can be used with process orders? (Choose three)
- Question #62
You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning procedures?
- Question #63
Which activity can trigger an automatic availability check for the components of a production order?
- Question #64
You want to enhance the system statuses of a production order with user statuses. How do you do this?
- Question #65
The final assembly of a finished product should only be triggered when a customer order arrives. Which planning strategy for the finished product do you use?
- Question #66
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)
- Question #67
What is SAP Solution Manager?
- Question #68
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work cen...
- Question #69
What could be a consequence of confirming an operation?
- Question #70
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?
- Question #71
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials). Which of the following planning file entries for this mater...
- Question #72
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)
- Question #73
For which of the following objects can you enter a confirmation? (Choose two)
- Question #74
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements ar...
- Question #75
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- Question #76
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- Question #77
Which functions can be triggered before releasing a production order? (Choose three)
- Question #78
You want to produce a finished product only when it is requested by a customer order in make-to- order production. However, all assemblies need to be procured beforehand. How can y...
- Question #79
Which of the following properties about the planning functions available in SAP ECC applies?
- Question #80
Where can you define the default storage location for the material component of a production order? (Choose three)
- Question #81
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)
- Question #82
Which objects can you use in the production order for a material component to propose the storage location in its reservation? (Choose three.)
- Question #83
From what point can you no longer use the Read PP master data in the production order?
- Question #84
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- Question #85
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters u...
- Question #86
Which data forms the basis for calculating the capacity requirement for an operation? (Choose three.)
- Question #87
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example,...
- Question #88
In SAP ECC, you calculate the standard available capacity for a work center capacity with the following data: start: 7:00:00 a.m., end. 3:00:00 p.m., break duration: 1 hour, rate o...
- Question #89
A finished material is to be planned in a controlled manner in the SAP ECC system in the context of requirements planning. The planned orders are scheduled using what is known as b...
- Question #90
Which of the following master data do you need to make available for repetitive manufacturing? (Choose three.)
- Question #91
Which of the following structural elements does a process order have? (Choose three.)
- Question #92
Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)
- Question #93
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an init...
- Question #94
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)
- Question #95
What does SAP ERP mean?
- Question #96
A final assembly process takes place at three work centers, one after the other. The routing, which consists of three associated operations (10, 20 and 30), plans for a specific BO...
- Question #97
In the task list, there is the possibility to work with suboperations. What can you do in more detail by using suboperations? (Choose two.)
- Question #98
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two.)
- Question #99
Which options can you offer a user of the SAP ECC system for managing costs (costing and settlement) with regards to production orders? (Choose two.)
- Question #100
Which of the following master data is mandatory for production order processing, when material reservations and capacity requirements for operations should be generated automatical...