C_TSCM42_66 Exam Questions
115 real C_TSCM42_66 exam questions with expert-verified answers and explanations. Page 3 of 3.
- Question #101
Which of the following functions occur when a production order is created? (Choose three.)
- Question #102
Which of the following master data do you always have to make available for material replenishment using the KANBAN procedure? (Choose two.)
- Question #103
A material was planned in the context of SAP ECC material requirements planning and the MRP controller subsequently processed the material by manually converting a specific planned...
- Question #104
Which information is contained in production versions for selecting routings and bills of material?
- Question #105
What does SAP ERP mean?
- Question #106
Which of the following statements is true for the simulation mode in the context of material requirements planning in SAP ECC?
- Question #107
Which of the following features are offered by MRP Areas (Material Requirements Planning Areas)? (Choose two.)
- Question #108
A supply chain planning run is to be carried out in the SAP ECC system as an example. What would be the most effective sequence in which to run through the planning modules?
- Question #109
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally...
- Question #110
Which of the following efforts can be minimized using the KANBAN procedure?
- Question #111
In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-based planning only, the planning table is to be used to plan this...
- Question #112
Which functions lead to a reduction in the capacity requirement for an individual operation at a work center? (Choose three.)
- Question #113
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
- Question #114
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account...
- Question #115
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?