ICYB Exam Questions
103 real ICYB exam questions with expert-verified answers and explanations. Page 1 of 3.
- Question #1
SIPOC stands for Suppliers, Inputs, ___________ , Output and Customers.
- Question #2
As we begin to describe the things occurring with our process through a Process Map we begin to see some steps that are NVA which stands for ____________.
- Question #3
As we identify customer and supplier requirements for a SIPOC we are urged to use the RUMBA approach which stands for Reasonable, Understandable, _____________, Believable and Achi...
- Question #4
Inputs that may affect your process to some degree but are not critical, are difficult to quantify and are random in nature are referred to as ___________.
- Question #5
Long-term Data represents all the variation that one can expect to experience from the output of the subject process.
- Question #6
The temperature of a liquid is being measured by a line operator. Which is least likely to be influenced by the instrument?
- Question #9
A Belt gathered the following defect data for a trouser production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be: D...
- Question #10
One of the primary objectives of constructing an X-Y Diagram is to separate the vital few X's from the trivial many X's.
- Question #12
Stability, Bias and Linearity define the ___________ of a Measurement System.
- Question #17
Lean Principles defines for us ________ specific areas where waste typically exists in our processes.
- Question #20
One of the 5S approaches to eliminating waste is to minimize work activities that are out of the ordinary thereby requiring unusual decisions and actions to accomplish the correct...
- Question #21
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of...
- Question #22
To minimize waste through the application of Lean Principles we do which of the following?
- Question #23
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is kno...
- Question #24
An important factor in a viable Control Plan is to determine who, when and to what level various personnel must be _________ to maintain the improvements made to a process.
- Question #25
Upon completion of a project a Belt must complete the ____________________ then transfer responsibility for this to the Process Owner.
- Question #30
Al bought a digital camera from his local electronics store. When he first used it he found the zoom lens function was inoperative because a gear was installed improperly. For the...
- Question #31
The formula Y = f(Xn) is a method of expressing the concept that the output of a process is a function of all the __________________?
- Question #33
A Belt has determined that the insurance claim form needn't be reviewed by accounting thereby improving the number of claims a processer can handle. According to Cost of Poor Quali...
- Question #35
The following Business Case is constructed properly. "During 2009 the commercial loan division experienced a 2.7% default rate versus a target of less than .5%. This costs the bank...
- Question #37
As we attempt to find a commonality of terms to assess the performance of a broad range of processes we use a key metric called the DPMO which stands for __________________________...
- Question #38
In an organization is the sum total of all the processes which occur in the business to take inputs and turn them into customer desired outputs is called the Value Chain.
- Question #39
When a Belt wishes to clarify the activities of various departments in a Process Map she is creating she adds a feature to the map called ______________.
- Question #44
One of the primary objectives of constructing an X-Y Diagram is to separate the vital few Y's from the trivial many Y's.
- Question #49
A ______________ is a graphical presentation of sample data that shows the number of times that a data point is a specific number.
- Question #51
Lean Principles defines for us seven specific areas where ________ typically exists in our processes.
- Question #54
One of the 5S approaches to eliminating waste is to organize all tools, information and inventory utilized at a workstation in such a manner that the operator knows exactly where t...
- Question #55
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of...
- Question #56
To minimize waste through the application of Lean Principles we do which of the following?
- Question #57
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is kno...
- Question #58
An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.
- Question #59
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
- Question #63
Upon completion of a project a Belt must complete the Documentation Plan then transfer responsibility for this to the ____________________.
- Question #64
Which phase of DMAIC focuses on establishing the baseline performance of a process?
- Question #65
Which Lean waste refers to producing earlier, faster, or more than needed?
- Question #66
Which tool helps the team understand the sequence of activities and identify potential handoff issues?
- Question #67
A team interviews customers to identify what features matter most. This activity is part of:
- Question #68
Which of the following is an example of attribute data?
- Question #69
When a process has proven itself to function at a Six Sigma level this means there are less than ________ defects per million opportunities.
- Question #70
Six Sigma refers to a process whose output has at least 95% of its data points within 6 Standard Deviations from the Mean.
- Question #71
Training cost is $3,000 and a project required an initial investment of $12,000. If the project yields monthly savings of $1,800 beginning after 3 months, what is the payback perio...
- Question #72
The ROI for a project is a measurement metric that stands for Return on Investment and is one of the methods used to measure the success of a Lean Six Sigma project.
- Question #73
The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and Control.
- Question #74
Voice of the Customer is a Lean Six Sigma technique to determine the ___________ attributes of a product or service.
- Question #75
Benefits and working conditions would be primarily the concern of which of the following?
- Question #76
In the expression Y = f(Xn) Y, the output, is the ___________ variable and Xn, the inputs, are the __________ variables.
- Question #77
When we assess the Voice of the Customer we are attempting to determine the gaps in our processes between "what is" and __________________.
- Question #78
Which of the following would likely not be a CTQ (Critical-to-Quality) for the purchase of a product?
- Question #80
A Pareto chart is based on which key principle?
- Question #81
In a SIPOC diagram, 揚rocesses?typically show: