C_TSCM44_65 Exam Questions
75 real C_TSCM44_65 exam questions with expert-verified answers and explanations. Page 1 of 2.
- Question #1
How do you ensure that PP/DS planned orders retain the end date and quantity of previously created SNP orders?
- Question #2
Your customer wants to see feasible receipt quantities in a "confirmed production" key figure in DP. What do you have to do to fulfill this request?
- Question #3
In what situations do you use SAP SCM APO instead of SAP ECC PP? Note: There are 3 correct answers to this question.
- Question #4
Which group of options is possible in SCM GATP but not in ATP in ECC?
- Question #5
You want to define virtual safety stock within PP/DS. Which statements correctly describe this kind of modeling? Note: There are 3 correct answers to this question.
- Question #7
Which configuration rule can you use to set up InfoCubes and planning object structures?
- Question #8
How can you back up planning data to the internal BW?
- Question #9
Which of the following is a valid function of the internal BW?
- Question #10
Which of the steps described below do you need to perform when creating InfoObjects to set up a DP or SNP scenario?
- Question #11
The customer wants to use CTM to check for free stock in all locations first, and then for possible production. How can you implement this scenario?
- Question #12
What is the correct feature of the CTM run?
- Question #13
What do you use to set up demand prioritization? Note: There are 3 correct answers to this question.
- Question #14
Which CTM strategies can you use for late demand fulfillment? Note: There are 2 correct answers to this question.
- Question #15
You have to decide which bucket logic to apply to the ATP buckets for the product availability check. Which system settings for the bucket logic are possible? Note: There are 2 cor...
- Question #16
What influence does the checking horizon have for demands which cannot be confirmed in time?
- Question #17
You want to use product allocations in the SCM system. There are different types of dates that can be used for the allocation check. Which dates can you check against?
- Question #18
When you call the GATP check from the ECC system, several control parameters are passed from ECC to SCM. These parameters also exist in the SCM system, but with a different name. I...
- Question #19
When can you use more than one check instruction during order creation? Note: There are 3 correct answers to this question.
- Question #20
At which level do you decide which system carries out the ATP check?
- Question #21
What is the relationship between availability check in the MRP 3 view, the checking group and the check mode? Note: There are 2 correct answers to this question.
- Question #24
You want to use the Multi-Item Single Delivery Location (MISL) scenario in GATP. What do you need to do to use this function?
- Question #25
In the product availability check, you do not want receipt elements which are in the past to be considered. Where can you set this up?
- Question #26
You want to use an allocation check in GATP. Which of the following activities do you need to perform to implement this function?
- Question #27
You use GATP in the SCM system. For the transportation and shipment activities, you want to set up transportation and shipment scheduling. Where do you do this? Note: There are 2 c...
- Question #28
You want to set up GATP in the SCM system. How can you reuse the existing ATP Customizing from the ECC system?
- Question #29
Can planners plan the same characteristic value combinations (CVCs) if the liveCache lock is activated?
- Question #32
The customer wants to implement safety stocks dependent on forecast accuracy and replenishment lead time accuracy. Quantity-based complete deliveries are needed. What do you have t...
- Question #33
You set up a DP scenario for a customer. What are the capabilities of a DP planning area? Note: There are 3 correct answers to this question.
- Question #34
The customer needs a solution to group together the deployment stock transfer of different products to ensure a minimum load of trucks and to avoid overloading. How do you implemen...
- Question #35
The customer needs a deployment strategy that distributes the complete stock of the plant even if the total demand across all distribution centers is lower. Which deployment rule d...
- Question #36
You have to define selections in SNP. Apart from the SNP Planner, which fields can you use?
- Question #37
Why would you use an SNP PDS instead of an SNP PPM?
- Question #38
Which statements describe macro capabilities for DP and SNP correctly? Note: There are 3 correct answers to this question.
- Question #39
The customer needs a FORECAST key figure that is disaggregated initially according to historical data. With planned data, the FORECAST has to be calculated according to the ratio o...
- Question #40
What does the customer need to know about the planning object structure when setting up a DP scenario?
- Question #41
The customer wants to implement SNP aggregated planning for a product group with capacity leveling. What do you have to set up?
- Question #42
The customer needs an SNP planning area for time-dependent safety stocks and scheduling agreements. As well as maintaining a time-dependent safety stock method in the product maste...
- Question #43
The customer has sales orders (SOs) in the distribution center (DC). How can you prioritize these SOs against planned independent demands?
- Question #44
Rounding in DP can be a problem because of disaggregation. How can you avoid large rounding errors? Note: There are 2 correct answers to this question.
- Question #46
You can store transactional data in APO in liveCache as time series or orders. You can also back this data up to BW. Which transaction is described correctly?
- Question #47
Which options allow you to monitor resource alerts (capacity overload) ? Note: There are 2 correct answers to this question.
- Question #48
Your customer produces finished products in make-to-stock production using externally procured components. They want to procure components based on forecasting but carry out final...
- Question #49
Which configuration step(s) allow(s) you to choose a specific variable planning heuristic during interactive planning?
- Question #50
Which of the following configuration sequences describes the setup for "days' supply / receipt days" key figures within the product view correctly? Note: The desired result is disp...
- Question #51
The system offers you two process control heuristics, SAP_MRP_001 and SAP_MRP_002, when setting up the multilevel MRP run in APO-PP/DS. The APO master data includes finished produc...
- Question #52
The implementation project requires finite scheduling that considers different finiteness levels. What controls the finiteness level? Note: There are 2 correct answers to this ques...
- Question #53
A customer defines a variant for a production planning run and needs to specify the planning objects for the SAP_MRP_002 heuristic. They ask you for the appropriate selection crite...
- Question #56
Your customer creates an infinite multilevel MRP run for a finished product and its components using the process heuristic SAP_MRP_001. Product heuristics are not maintained in the...
- Question #57
The APO PP/DS planning application offers certain advantages compared to original ECC PP and CRP capabilities. Which of the following statements are correct? Note: There are 2 corr...
- Question #58
Your customer runs an integrated system landscape including SAP ECC and SAP SCM and wants to specify a firming interval of 10 working days that rolls forward over time for an APO-...