In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be pop...
- Question #2
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)
- Question #3
Which objects can you use in the production order for a material component to propose the storage location in its reservation? (Choose three.)
- Question #4
From what point can you no longer use the Read PP master data in the production order?
- Question #5
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- Question #6
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters u...
- Question #7
A user has entered planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a product. For the coming months, requirements with requirement type LS...
- Question #8
SAP C_TSCM42_64 Exam Which of the following statements about the planning functions available in SAP ECC are true? (Choose two.)
- Question #10
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example,...
- Question #11
In SAP ECC, you calculate the standard available capacity for a work center capacity with the following data: start: 7:00:00 a.m., end. 3:00:00 p.m., break duration: 1 hour, rate o...
- Question #12
A finished material is to be planned in a controlled manner in the SAP ECC system in the context of requirements planning. The planned orders are scheduled using what is known as b...
- Question #14
Which of the following structural elements does a process order have? (Choose three.)
- Question #15
Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)
- Question #16
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an init...
- Question #17
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)
- Question #18
What does SAP ERP mean?
- Question #19
A final assembly process takes place at three work centers, one after the other. The routing, which consists of three associated operations (10, 20 and 30), plans for a specific BO...
- Question #20
In the task list, there is the possibility to work with suboperations. What can you do in more detail by using suboperations? (Choose two.)
- Question #21
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two.)
- Question #22
Which options can you offer a user of the SAP ECC system for managing costs (costing and settlement) with regards to production orders? (Choose two.)
- Question #23
Which of the following master data is mandatory for production order processing, when material reservations and capacity requirements for operations should be generated automatical...
- Question #24
Which of the following functions occur when a production order is created? (Choose three.)
- Question #25
Which of the following master data do you always have to make available for material replenishment using the KANBAN procedure? (Choose two.)
- Question #26
A material was planned in the context of SAP ECC material requirements planning and the MRP controller subsequently processed the material by manually converting a specific planned...
- Question #27
Which information is contained in production versions for selecting routings and bills of material? SAP C_TSCM42_64 Exam
- Question #28
A new material with the following properties is to be recorded in SAP ECC. the material is kept in stock, is externally procured, and is used as a component in the bills of materia...
- Question #29
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number i...
- Question #30
A customer has been using planning strategies 30 (production by lots) and 10 (anonymous make-to- stock production) in SAP ECC. The customer wishes to move in part to planning strat...
- Question #31
SAP C_TSCM42_64 Exam Which of the following aspects characterize repetitive manufacturing in a manufacturing plant? (Choose three.)
- Question #32
What options for selecting a routing exist when creating a production order? (Choose three.)
- Question #33
The Service Desk is available as part of the SAP Solution Manager. Which functions are included in the scope of the Service Desk? (Choose two.)
- Question #34
Which of the following prerequisites have to be fulfilled for production orders to be transferred to a business data entry system via the Plant data collection (PP-PDC) interface?...
- Question #35
In modeling in-house production using SAP ECC, bills of material (BOM) are to be recorded in the system. On which business levels can you create a BOM? (Choose two.) SAP C_TSCM42_6...
- Question #36
The master data for a logistical process is to be stored in the SAP ECC system. In this context, you require the production versions for subsequent planning and production. You kno...
- Question #37
For a specific end product, you want to use a planning time fence and fixing type 1 to ensure that the planning situation in SAP ECC calms down in a short-term time window. Two cus...
- Question #38
What are the consequences of a confirmation of an operation? (Choose two.)
- Question #39
Which of the following possible errors would lead to the message shown? (Choose two.) SAP C_TSCM42_64 Exam
- Question #40
In the course of a project phase, the customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the follow...
- Question #41
Which properties does ECC Master Production Scheduling (MPS) have? (Choose three.)
- Question #42
A customer wishes to only produce a finished product when customer orders for it are present. Final assembly should then be carried out at short notice in make-to-order production....
- Question #43
Which one of the following scheduling types cannot be assigned as default to an order type (production order)?
- Question #44
In your enterprise, a planning strategy is used in SAP ECC that enables joint planning of all MRP scheduled assemblies for a finished product to trigger procurement of these assemb...
- Question #45
An enterprise based in the USA produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is...
- Question #46
Which of the following functions are available in the SAP ECC system for leveling overloads in individual work centers with the capacity planning tools? (Choose three.)
- Question #47
The company that you advise does not want to manage certain value-intensive materials in the warehouse stock. Instead, the user wishes to control material provision in such a way t...
- Question #48
In SAP ECC, a customer tests the firming options for planned orders. The customer first sets the manual firming date from the stock/requirements list to firm planned orders that sh...
- Question #49
Which of the following requirements for a manufacturing plant can be supported by using production orders? (Choose three.)
- Question #50
The user you advise requests that you make it possible for the user to produce materials for stock, for customer orders, projects, orders and cost centers with production orders. W...
- Question #51
Which statement regarding lot size procedures is correct?
- Question #52
Where are the standard operation times for an operation defined?