C_TSCM42_64 · Question #41

Which properties does ECC Master Production Scheduling (MPS) have? (Choose three.)

The correct answer is B. MPS items can be defined on MRP Area level (Material Requirements Planning Area). C. Non-MPS items can be taken into consideration by an MPS run. D. MPS items can be defined on plant level. See the full explanation below for the reasoning.

Question

Which properties does ECC Master Production Scheduling (MPS) have? (Choose three.)

Options

  • AMPS items can be taken into consideration by a standard MRP run (Material Requirements Planning).
  • BMPS items can be defined on MRP Area level (Material Requirements Planning Area).
  • CNon-MPS items can be taken into consideration by an MPS run.
  • DMPS items can be defined on plant level.
  • EThe planning of MPS and Non-MPS items is always carried out in one planning run.

How the community answered

(66 responses)
  • A
    20% (13)
  • B
    70% (46)
  • E
    11% (7)