C_TSCM42_64 · Question #24
Which of the following functions occur when a production order is created? (Choose three.)
The correct answer is B. Calculating the lead time for the production order C. Selecting and copying a bill of material D. Selecting and copying a routing. See the full explanation below for the reasoning.
Question
Which of the following functions occur when a production order is created? (Choose three.)
Options
- ACopying a document that is assigned to the material master for the product to be produced
- BCalculating the lead time for the production order
- CSelecting and copying a bill of material
- DSelecting and copying a routing
- ECalculating the quantity to be produced on the basis of the available material stocks
How the community answered
(30 responses)- A10% (3)
- B73% (22)
- E17% (5)