- Question #51Project Management
During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendation...
bidding processstakeholder reportingbid reviewICT designer roles - Question #52Project Management
An RFQ usually provides more detail than RFP in selection material such as
RFQRFPprocurementmaterial specifications - Question #53Building Automation Systems
A system integration approach of a BAS on to a LAN can usually reduce the cost of cabling- related changes by
building automation systemLAN integrationcost reductionsystem integration - Question #54Project Management
Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)
scope of workproject documentationscheduletechnical considerations - Question #55Project Management
Which of the following team members is responsible for ensuring compliance with me contract documents (CD)?
contract documentscomplianceICT distribution designerproject roles - Question #56Project Management
In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing
scope of workdesign responsibilitiesmaterial specificationsICT designer - Question #57Horizontal Cabling Systems
The marketing department of a firm has tasked the organization to design a structured cabling system allowing them to support either 10G6aseT or HDBASE-T. The budget requires that...
Category 6A10GBaseTHDBASE-Tstructured cabling standards - Question #58Horizontal Cabling Systems
What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?
BICSI standardsCategory 6horizontal cablingminimum performance - Question #59Project Management
Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?
submittalsgeneral contractormaterial selectionconstruction administration - Question #60Project Management
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost- effective telecommunications construction project? (Select two options.)
ICT designer roleschange ordersRFI resolutionconstruction project management - Question #61Pathways and Spaces
A 3 trade size conduit is sized at
conduit sizingtrade sizeconduit dimensionspathways - Question #62Project Management
Which of the following options BEST describes Request for Quote (RFQ)?
RFQprocurementconstruction documentsbidding - Question #63Telecommunications Cabling Infrastructure
Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm">
OM4 fibermultimode fiberEMB bandwidthoptical fiber specifications - Question #64Project Management
A project's installation start involves a Kickoff Meeting and the General Contractor's Coordination Meeting. As part of the designer's responsibilities, which two of the following...
kickoff meetingRFI processproject coordinationdesigner responsibilities - Question #65Network Technologies and Systems
An Ethernet passive optical network (EPON) uses an aggregation device called an optical line terminal (OLT). An OLT can support a MINIMUM of______subscribers per port using a passi...
EPONOLTpassive optical networkoptical splitter - Question #66Pathways and Spaces
What is the RECOMMENDED bend radius of a conduit with an internal diameter of 51 mm (2 in)?
bend radiusconduit installationpathway designconduit specifications - Question #67Pathways and Spaces
Using a vertical cable support structure can create issues for the cable attached to the pathway Several issues can result It the support work is not clone correctly. Which two of...
vertical cable supportcable managementfiber breakagecable damage - Question #68Pathways and Spaces
The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103...
backbone pathwaysfloor sleevesusable floor spacebackbone design - Question #69ICT Distribution Design Process
An ICT distribution designer is reviewing a client's site information (spaces and pathways) to determine network technology and equipment selection. This is referred to as a_______...
bottom-up designdesign methodologynetwork designsite assessment - Question #70Project Management
Which stakeholder of a project team is responsible to provide closeout documentation to the client? Architect
closeout documentationstakeholder rolesproject deliveryICT designer - Question #71Pathways and Spaces
The size and number of conduits or sleeves used for backbone pathways depend on the usable floor space served by the backbone distribution system. What is the MINIMUM trade size of...
trade sizebackbone sleevestelecommunications roombackbone pathways - Question #72Grounding, Bonding, and Electromagnetic Protection
Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)
radiated interferenceEMIcable shieldinginterference sources - Question #73Project Management
What step can be a phase of the Bidding and Negotiating process?
bidding processresponse evaluationprocurementnegotiating - Question #74ICT Distribution Design Process
How many classes of telecommunications administration are there?
telecommunications administrationadministration classesTIA standardsICT administration - Question #75Project Management
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
Statement of Workcost estimateproject documentationSoW - Question #76Pathways and Spaces
Based on the estimated work area size, what is the MAXIMUM number of work areas that a telecommunications enclosure shall serve?
telecommunications enclosurework areashorizontal distributionfloor space - Question #77Project Management
Which two of the following are included in the ICT distribution designer's role of vendor and contractor coordination'? (Select two options.)
vendor coordinationcontractor coordinationdesigner rolesproject communication - Question #78Grounding, Bonding, and Electromagnetic Protection
Which of the following terms is often used to describe two parallel paths that have identical conductive terminations to two separate grounding reference points?
ground loopgroundingbondinggrounding reference points - Question #79ICT Distribution Design Process
Which two of the following may the ICT distribution designer need to provide in order to identify the BEST solutions for the client's need? (Select two options.)
client needs analysispreliminary budgetmilestonesdesign solutions - Question #80Codes, Standards, and Regulations
When designing for horizontal pathways in an environment that requires fire-stopping for penetrating a rated wall, what is the MAXIMUM till ratio for telecommunications cabling in...
fill ratiocable trayfire-stoppingrated wall penetration - Question #81Physical Infrastructure and Cabling Systems
In a contiguous properly environment (e. g., where campus backbone cables exist), which two of the following are CRITICAL factors to understand for maintenance and growth purposes?...
fill ratiorecord keepingcable compositioncable capacity - Question #82Project Management
ICT project installation issues that require coordination with mechanical, electrical and/or other "trades" can be BEST accomplished by
RFItrade coordinationproject coordinationconstruction management - Question #83System Design
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR's should be terminated at the
hierarchical star topologybackbone terminationMC/CDcabling flexibility - Question #84Project Documentation
Which of the following two items are examples of items associated with a submittal? (Select two options.)
submittalsshop drawingsproduct dataproject documentation - Question #85Cabling Infrastructure and Pathway Design
Which two of the following are ADVANTAGES of aerial pathways? (Select two options.)
aerial pathwayscable managementinstallation efficiencymaintenance accessibility - Question #86Project Administration and Contractor Management
Which two of the following documents MUST be submitted by the communication's project contractor for review and approval? {Select two options.)
contractor submittalsdesign documentationproject managementcommunications infrastructure - Question #87Project Management
When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following action...
submittal rejectionvariance requestalternate productscontract requirements - Question #88Program Strategy Alignment
A large international manufacturing company is centralizing its IT which is currently spread over 16 countries. The transition means physically regrouping the infrastructure and al...
IT centralizationprogram planningcost-benefit analysisinfrastructure transformation - Question #89Program Governance
To create market advantage, a program sponsor requests accelerating the implementation of a new manufacturing process that is based on a recently improved system component. The pro...
program accelerationsponsor managementprogram governancebenefits delivery risk - Question #90Program Stakeholder Engagement
A program manager evaluates conflicting stakeholder demands associated with cost, schedule, and intended benefits. The implementation team has a strong interest in cost and schedul...
stakeholder conflictcost-schedule-benefits tradeoffsstakeholder engagementprogram balance - Question #91Program Life Cycle Management
A program to implement a new payroll processing system at a healthcare company is nearing completion and is under budget. What should the program manager do next?
program closuregovernance board approvalbudget managementclosure activities - Question #92Program Governance
A program manager has a multiple-project program that is scheduled to be completed by year's end. During the program delivery phases of the protects several mandatory changes are i...
change managementschedule extensionchange requestprogram delivery - Question #93Program Governance
A program governance board mandates that phase gate reviews must be held so each component project can be reviewed and individually authorized to proceed to the next phase. Trackin...
phase gate reviewbenefits realizationprogram governancecomponent authorization - Question #94Program Benefits Management
A program manager concurrently implements a software program at four client locations. The client's objective is to maintain quality while shortening the software implementation ti...
benefits registerKPIsmetrics definitionquality management - Question #95Program Stakeholder Engagement
An R&D group director approves a major program's charter although the director has a high level of understanding of the program's scope (hoy are unsure of how the program manager c...
stakeholder alignmentprogram milestonesplanningprogress monitoring - Question #96Program Life Cycle Management
A component is scheduled to close at the end of the week. What should the program manager verity prior to allowing the component to close?
component closurequality requirementsprogram objectivesclosure verification - Question #97Program Stakeholder Engagement
During program execution, a program manager receives feedback from an executive sponsor (hat some program stakeholders may not understand the intended benefits of the program. Whic...
stakeholder analysisbenefits communicationstakeholder engagementprogram execution - Question #98Program Procurement Management
During a program's definition phase, it is determined that the best approach for delivering the programs intended benefits is to supplement corporate resources with the procurement...
procurement planningmake-or-buy decisionscontract typesprocurement strategy - Question #99Program Benefits Management
A program is midway through the program delivery phase when a key stakeholder asks if the program is meeting its defined objectives. How should the program manager demonstrate the...
KPI definitionprogram performance measurementbenefits trackingstakeholder reporting - Question #100Program Resource Management
The project managers for component projects A and B schedule the same resource to perform tasks during the same timeframe, resulting in an over-allocation. The program manager revi...
resource interdependencyover-allocationresource managementcomponent projects