- Question #56Control Phase Basics
Upon completion of a project a Belt must complete the ____________________ then transfer responsibility for this to the Process Owner.
documentation planprocess ownerproject closureknowledge transfer - Question #57Control Phase Basics
Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?
systems and structuresbehavior changeperformance objectivesprocess control - Question #58Control Phase Basics
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
control plansustainabilityprocess controlcontinuous improvement - Question #59Improve Phase Basics
To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.
automationerror-proofingoperator defectsPoka-Yoke - Question #60Control Phase Basics
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
monitoring plankey metricsout-of-spec conditionsprocess control - Question #61Lean Six Sigma Fundamentals
When a process has proven itself to function at a Six Sigma level this means there are less than 3.4 defects per ___________ opportunities.
Six SigmaDPMOdefects per million opportunitiesprocess performance - Question #62Lean Six Sigma Fundamentals
Six Sigma refers to a process whose output has 100% of its data points within 8 Standard Deviations from the Mean.
Six Sigma definitionstandard deviationnormal distributionprocess capability - Question #63Define Phase Basics
Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period i...
ROIreturn on investmentfinancial analysispayback period - Question #66Define Phase Basics
Voice of the Business is a Lean Six Sigma technique to determine the needs and wants of the ______________ of the business.
Voice of BusinessVOBstakeholdersbusiness needs - Question #68Analyze Phase Basics
Y, the output of a process, is the ______________ variable while Xn, the various inputs to a process, are the _____________ variables.
dependent variableindependent variableY=f(X)process variables - Question #70Define Phase Basics
Which of the following would likely be a CTQ (Critical-to-Quality) for the purchase of a service?
CTQVoice of Customerservice qualitycustomer requirements - Question #72Lean Six Sigma Fundamentals
Al bought a digital camera from his local electronics store. When he first used it he found the zoom lens function was inoperative because a gear was installed improperly. For the...
Cost of QualityInternal Failure CostCOPQdefect categorization - Question #75Define Phase Basics
A Belt has determined that the insurance claim form needn't be reviewed by accounting thereby improving the number of claims a processer can handle. According to Cost of Poor Quali...
COPQhard savingsRTYcost savings - Question #77Define Phase Basics
The following Business Case is constructed properly. "During 2009 the commercial loan division experienced a 2.7% default rate versus a target of less than .5%. This costs the bank...
Business Caseproject charterfinancial impactDefine phase - Question #78Define Phase Basics
As we conceive and define a LSS project one of the overriding things we hope to accomplish is to reduce the _____________________.
COPQproject objectivesLSS goalsquality cost - Question #79Measure Phase Basics
As we attempt to find a commonality of terms to assess the performance of a broad range of processes we use a key metric called the DPMO which stands for __________________________...
DPMOdefect metricsprocess performancesigma level - Question #80Lean Six Sigma Fundamentals
In an organization is the sum total of all the processes which occur in the business to take inputs and turn them into customer desired outputs is called the Value Chain.
Value Chainprocess inputs outputsbusiness processesvalue stream - Question #81Measure Phase Basics
When a Belt wishes to clarify the activities of various departments in a Process Map she is creating she adds a feature to the map called ______________.
swim lanesprocess mappingdepartment activitiesprocess map - Question #84Analyze Phase Basics
With a Fishbone Diagram we use the legs to define each source of a potential defect and along the legs we enter each potential means by which a defect could be introduced into our...
Fishbone diagramcause and effectroot cause analysisIshikawa - Question #85Measure Phase Basics
The purpose of a ______________ is to identify the complexity of the process and to assist in identifying critical steps in the process.
process mapprocess complexitycritical stepsprocess analysis - Question #87Measure Phase Basics
In order to properly draft a Process Map at the start of a project we are told to __________________ from beginning to the end.
process mappinggemba walkcurrent stateprocess documentation - Question #88Analyze Phase Basics
The "Equipment" category of Root Causes on a Fishbone Diagram would be used primarily used to generate ideas as to which of the following are possible causes for defects?
Fishbone diagramequipment causesroot cause categoriescause and effect - Question #89Define Phase Basics
At the beginning of a project we must keep in mind there are basically three views of a process: What you THINK it is, What the SUPPLIER wants and What it SHOULD be.
process viewscurrent stateprocess mappingDefine phase - Question #92Define Phase Basics
SIPOC stands for Suppliers, Inputs, ___________ , Output and Customers.
SIPOCprocess frameworkDefine phaseprocess mapping - Question #93Measure Phase Basics
A Micro Process Map may map a process showing the entire activities of a department and can likely be broken into many Macro Process Maps showing numerous processes that comprise t...
process mappingmacro process mapmicro process mapprocess hierarchy - Question #94Define Phase Basics
As we identify customer and supplier requirements for a SIPOC we are urged to use the RUMBA approach which stands for _____________, Understandable, Measurable, Believable and Achi...
RUMBASIPOCcustomer supplier requirementsDefine phase - Question #96Measure Phase Basics
_____________ represents all the variation that one can expect to experience from the output of the subject process.
long-term dataprocess variationdata collectionprocess capability - Question #97Measure Phase Basics
A Belt gathered the following defect data for a polyurethane production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would...
Pareto Chartdefect datadata orderingquality tools - Question #99Measure Phase Basics
One of the primary benefits of your team working together to create an X-Y Diagram is that the data collected from this exercise is accurate and certain.
X-Y Diagramdata accuracyteam collaborationprocess inputs - Question #100Measure Phase Basics
Measurement System Analysis is a procedure used to quantify variation of the method or system used for taking measurements and used to assure usable data is collected.
Measurement System AnalysisMSAvariationdata collection - Question #106Measure Phase Basics
A ______________ is a graphical presentation of sample data that shows the number of times that a data point is a specific number.
Histogramfrequency distributiondata visualizationgraphical tools - Question #107Analyze Phase Basics
A tool we use to identify possible failures (defects) in our process and the impact they may have is the _________________.
FMEAfailure identificationdefect analysisprocess failures - Question #111Improve Phase Basics
One of the 5S approaches to eliminating waste is to organize all tools, information and inventory utilized at a workstation in such a manner that the operator knows exactly where
5S methodologyStraighteningworkplace organizationwaste elimination - Question #112Control Phase Basics
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of...
Control PlanFMEAResponse Planprocess sustainability - Question #113Improve Phase Basics
To minimize waste through the application of Lean Principles we do which of the following?
Lean Principleswaste elimination5Sworkplace organization - Question #114Lean Six Sigma Fundamentals
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is kno...
Kaizencontinuous improvementwaste eliminationLean Principles - Question #115Control Phase Basics
An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.
Standard Operating Proceduretrainingprocess controlsustainability - Question #120Control Phase Basics
Upon completion of a project a Belt must complete the Documentation Plan then transfer responsibility for this to the ____________________.
Documentation PlanProcess Ownerproject handoffproject closure