C4070-604 Exam Questions
75 real C4070-604 exam questions with expert-verified answers and explanations. Page 1 of 2.
- Question #1
For a z196, post installation support requires a discussion with the customer about telephone and remote support service. Which of the following is the best recommendation to the c...
- Question #2
z196 has better performance than z10 EC. Which of the following is the reason?
- Question #3
A System z technical specialist is configuring an MES upgrade of a z10EC to a z196. The MRREPORT does not properly reflect the latest z10 configuration since a few cards were swapp...
- Question #4
A customer is looking for a solution that delivers a workload management across the platforms that run his core application. Additionally he is interested in a continuous availabil...
- Question #5
A prospective zEnterprise customer is fascinated with the addition of the zBX products. The sales specialist is discussing the flexibility of System z family of servers. Which of t...
- Question #6
A System z customer has a new CIO. The CIO is concerned about continuous operations and recovery following a site catastrophe. Which of the following addresses this issue?
- Question #7
A customer is planning to upgrade from a z9 BC to z114. The customer used carry-forward for the FICON cards when purchasing the z9. The FICON cards are used for accessing DASD via...
- Question #8
What is the minimum acceptable process or technique to estimate the capacity requirement for a replacement CPC?
- Question #9
A z114 will be defined as a member of an ensemble and use Unified Resource Manger. Which of the following options correctly describe the HMC requirements?
- Question #10
The System z Technical Specialist is asked by a customer for differentiators of a zBX solution with x86 blades compared to x86 blades in a traditional BladeCenter. Which of the fol...
- Question #11
Which of the following FICON Express channels is supported on a new build z114 configuration?
- Question #12
A System z FTSS needs POWER blades configured for a zBX. Which of the following procedures should be used for this configuration?
- Question #13
A customer is migrating to z114 and z/VM V6.1. The existing z9 BC will be used as cold standby system in a separate datacenter. Which of the following is correct?
- Question #14
Which of the following tools provides a financial analysis for a distributed server consolidation on System z opportunity at no cost to the customer?
- Question #15
A presales TDA meeting is schedule for a account purchasing a z196 processor to replace distributed systems. Which of the documents are the minimum required for the meeting?
- Question #16
Which of the following is an advantage of PCIe I/O drawers over I/O cages?
- Question #17
A customer has PSIFB installed on his z196 processor. The customer wants to know how many CHPIDs can be configured across the two ports on the HCA card?
- Question #18
Which of the following is a key benefit to customers who deploy zEnterprise compared to other solutions?
- Question #19
What is a differentiator of the System z compared to other hardware platforms?
- Question #20
Which of the following customer environments would be the best Fit for the placement of a zBX?
- Question #21
Which of the following planning considerations for zBX environments is least critical compared with the others?
- Question #22
A System z technical specialist is designing a z196 solution. Which of the following may be selected using eConfig?
- Question #23
A System z customer technical staff is planning to upgrade their z9 to a new z114 with a Migration Offering. The customer group is discussing their plan with the System z technical...
- Question #24
Which of the following best describes zEnterprise architectural advantages?
- Question #25
A customer is considering a zEnterprise with a zBX. The customer has a back level AIX server installed running production workloads. Which of the following is the best action a spe...
- Question #26
A System z customer is planning to move their data center with several existing System z servers to a new space without a raised floor. Which of the following requirements should t...
- Question #27
A customer technical staff has been briefed on migration to a z114 or z196. They are discussing the new features with the System z Technical Specialist. Which of the following cust...
- Question #28
During which of the following activities do the customer and the technical specialist define post installation support?
- Question #29
Which new z196 feature provides significant error detection and correction capabilities for bit, lane, DRAM, DIMM socket and memory channel failures?
- Question #30
A new customer has approached a System z Technical Specialist to help them upgrade their older System z mainframe. Growth is minimal. Which of the following is needed to create an...
- Question #31
A customer will be upgrading their z10 EC to a z196 and would like to position the z196 to take advantage of new PCIe infrastructure for future support. Currently they have two I/O...
- Question #32
The System z Technical Specialist is sizing a zEnterprise z196 + zBX for a multi-tier applications, which is running today on z10 EC and distributed environment under AIX. Which of...
- Question #33
A customer recently ordered a z196 with a zBX. Which of the following is the best action a specialist could take to ensure the customer is satisfied with the new zBX?
- Question #34
Once the sale of a System z has been made, which of the following individuals is responsible to ensure that the implementation plan is executed?
- Question #35
A customer is planning a large consolidation project of multiple System z servers and numerous distributed servers. Which method is appropriate to perform a capacity planning and a...
- Question #36
A banking customer is running z/OS 1.6 on a z9 EC, they plan to upgrade to z196. Which of the following should an IBM technical specialist review with the customer?
- Question #37
The Solution edition for Data Warehousing includes which of the following components?
- Question #38
Which of the following includes major components needed to place an IBM zEnterprise into a Parallel Sysplex clustered environment?
- Question #39
A customer has a Power with AIX server farm with network connectivity to a zEnterprise processor. Which of the following would represent a potential zBX opportunity for this custom...
- Question #40
In a pre-Sale TDA review meeting, what requirement below is recommended before placing an order for new or upgrade system z114 or z196 machine being proposed. Which of the followin...
- Question #41
The customer is upgrading their z196 processor this weekend and wants to know what IBM team can configure an upgrade for additional capacity. Which team or group would configure th...
- Question #42
Which of the following tools provides capacity sizing for a distributed server consolidation to Linux on System z opportunity?
- Question #43
The zEnterprise Technical Specialist is talking with the customer support group. The customer technical staff has made several statements regarding their individual understanding o...
- Question #44
A customer has a very large z196 Complex with 8 CEC in a Sysplex. The customer would like IBM to perform a study to help move to the latestA customer has a very large z196 Complex...
- Question #45
A post installation support plan must be in place after the sale of the System z. Which of the following is the best way to do this?
- Question #46
A large z196 installation is exploring its new capability to manage a large number of I/O devices. Which of the following functions best addresses the requirement?
- Question #47
A new customer bought a zEnterprise 114 and zBX. The customer questioned why there are two HMCs configured. Which of the following is the reason that the HMC needs to be redundant?
- Question #48
A presales TDA meeting is in review process the Technical Specialist finds a problem with the configuration. The incorrect power cord on the z196 was ordered. The machine order was...
- Question #49
A zEnterprise customer is considering consolidating multiple CPCs. What basic technical factors should be included when performing a CEC consolidation analysis?
- Question #50
A customer is considering a z196 with a zBX. Which of the following is the best action a specialist could take to ensure customer satisfaction?