C4070-604 · Question #35
A customer is planning a large consolidation project of multiple System z servers and numerous distributed servers. Which method is appropriate to perform a capacity planning and a TCO analysis for…
The correct answer is C. Scorpion study to perform an in depth analysis of the environment. See the full explanation below for the reasoning.
Question
A customer is planning a large consolidation project of multiple System z servers and numerous distributed servers. Which method is appropriate to perform a capacity planning and a TCO analysis for the consolidation?
Options
- ARACEv tool to perform an in depth analysis of the environment
- BRule of thumb (ten x86 processors = 1 IFL, 3 Power CPUs = 1IFL)
- CScorpion study to perform an in depth analysis of the environment
- DCommercial benchmark results to estimate the hardware capacity and the BVAT for the TCO
How the community answered
(47 responses)- A4% (2)
- B2% (1)
- C83% (39)
- D11% (5)