C4070-604 · Question #3
A System z technical specialist is configuring an MES upgrade of a z10EC to a z196. The MRREPORT does not properly reflect the latest z10 configuration since a few cards were swapped recently. This…
The correct answer is B. Transmit the VPD to the IBM manufacturing plant. See the full explanation below for the reasoning.
Question
A System z technical specialist is configuring an MES upgrade of a z10EC to a z196. The MRREPORT does not properly reflect the latest z10 configuration since a few cards were swapped recently. This needs to be corrected for a TDA in two weeks. Which of the following actions address this situation?
Options
- ARun eConfig
- BTransmit the VPD to the IBM manufacturing plant
- CIgnore the removed cards and proceed with the configuration
- DManually edit the MRREPORT to account for the changes
How the community answered
(59 responses)- A15% (9)
- B75% (44)
- C7% (4)
- D3% (2)