The project team is geographically split between two time zones. Which of the following should be performed by the project manager?
The correct answer is B. Set up meeting times that are not necessarily a perfect fit, but are fair to both locations. See the full explanation below for the reasoning.
Question
The project team is geographically split between two time zones. Which of the following should be performed by the project manager?
Options
- AEscalate to the project sponsor with a preference to replace the remote members with local
- BSet up meeting times that are not necessarily a perfect fit, but are fair to both locations.
- CSchedule two separate meetings at the desired local time for the participants.
- DConvert traditional meetings into email updates and catch up on an exceptions basis.
How the community answered
(44 responses)- A5% (2)
- B77% (34)
- C7% (3)
- D11% (5)