Question
A draft structure for a risk trackingsheet has been provided below:
1.Risk identifier 2.Risk status 3.Risk description 4.Mitigation steps 5.Mitigation status Which of the following should be ADDED to the risk tracking sheet?
Options
- ARisk rating
- BStakeholder risk tolerance
- CRevised project schedule
- DRisk matrix
How the community answered
(58 responses)- A78% (45)
- B7% (4)
- C12% (7)
- D3% (2)