RCDD-002 Exam Questions
357 real RCDD-002 exam questions with expert-verified answers and explanations. Page 6 of 8.
- Question #251
What is a simplified cone of protection for lightning strikes as it pertains to a structure (building, pole, etc.)?
- Question #252
66-style connecting blocks (certain designs) can support up to what category of transmission performance?
- Question #253
Which two of the following apply during a project's close out process? (Choose two.)
- Question #254
Telecommunications cabling (e.g., voice, data, video, security, audio, control) can be damaged during the construction phases of rough-in, drywall installation, and during the sidi...
- Question #255
To properly size and provide accurate cost estimates for a communications distribution horizontal pathway that will include BAS system infrastructure, the designer should provide _...
- Question #256
An ICT distribution designer is providing labeling for a data center room number 2A, located on the second floor having 10 rows of cabinets. Which of the following identifiers/labe...
- Question #257
Placement of a buried OSP pathway in public Rights of Way may require a permit based on which of the following?
- Question #258
What is the FIRST step in quality evolution (focused on physical quality) when developing a quality plan?
- Question #259
Using an earth ground resistance tester, what is the recommended MAXIMUM value for resistance between any two points along the entire length of a bonding or grounding conductor (no...
- Question #260
For a backbone distribution system serving a usable floor space of 8,920 m2 (96,000 ft2), the MINIMUM slot area to be used for this back bone is
- Question #261
Which of the following is a method that an ICT distribution designer would use for clash detection with other disciplines?
- Question #262
What is the MAIN concern with a poke-thru installation?
- Question #263
An RFQ usually provides more detail than RFP in selecting material such as:
- Question #264
A client hired an ICT distribution designer who is designing some additional capacity for a customer owned aerial outside plant. Which of the following would be a PRIMARY considera...
- Question #265
For a cable tray installed within an ER, the RECOMMENDED access headroom is:
- Question #266
Where would an ICT distribution designer working for a company responding to a RFP expect to find requirements concerning alternative dispute resolution in the scope of work (SOW)?
- Question #267
Smaller buildings with a serving area larger than 1000 ft2 and less than 5000 ft2 may be served by:
- Question #268
Which two of the following components are included in a backbone distribution system (BDS)? (Choose two.)
- Question #269
What is the lightest-weight metallic conduit manufactured?
- Question #270
Rolling objects create what type of load on an access flooring system?
- Question #271
What is the MINIMUM lighting requirement for telecommunications spaces?
- Question #272
An ICT distribution designer is coordinating with local agencies for an upcoming campus improvement project which could affect the design. Which two of the following listed items w...
- Question #273
What is the derating factor for a 24 AWG (0.51 mm) stranded cords?
- Question #274
What is a passive optical network (PON)?
- Question #275
A commercial office building floor has a usable floor space of 1858 m2 (20,000 ft2). What is the MINIMUM number of 103 mm (4 trade size) conduits that shall be required to intercon...
- Question #276
A MINIMUM separation distance of =305 mm (12 in) between telecommunication cables and power cables with EMI exceeding 5 kVA is acceptable in which of the following cases?
- Question #277
Which of the following is the CORRECT calculation to determine equipment heat load resulting from its power (W) consumption?
- Question #278
What is the MAXIMUM length of continuous conduit allowed before a pull point or pull box needs to be installed?
- Question #279
What should be considered when designing a fiber network?
- Question #280
As a project manager, what should the FINAL task be at of the end of each project?
- Question #281
The type of apparatus housed in ERs vary greatly in size, purpose and function. Which two of the following active equipment is included? (Choose two.)
- Question #282
In what year was BICSI formally incorporated?
- Question #283
In the ceiling zones method of ceiling distribution, divide the usable floor area into zones of how many square feet?
- Question #284
In a computer or control room where the plenum is used for heating, ventilating, and air- conditioning, the finished floor height should be a minimum of how many inches?
- Question #285
Which of the following would be the medium duty concentrated load capacity of an access floor in an equipment room?
- Question #286
What is the typical slab thickness requirement for a two level underfloor duct system where feeder and distribution ducts intersect?
- Question #287
When designing an underfloor duct system, which of the following would be the cross-sectional area of the duct serving each 100 square feet of floor space with 3 cables to each of...
- Question #288
What is the maximum pulling force guideline for a 2 or 4 strand fiber cable?
- Question #289
A horizontal cabling link is distinguished from a horizontal cabling channel because it does not include which of the following.
- Question #290
What is the MINIMUM clearance needed between the front of the telephone booth and any wall or fixture for most installations?
- Question #291
Exhibit: A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability...
- Question #292
A telephone facility and an electrical facility are required in a tunnel. To reduce the effects of EMI and eliminate the need for additional shielding of the cables, where would ea...
- Question #293
Exhibit: In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
- Question #294
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-i...
- Question #295
Exhibit: In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?
- Question #296
What is the air change requirement for a tunnel of 610 m (2000 ft) long with a diameter of 3.4 m (11 ft)?
- Question #297
In the last year, all program phase gate reviews received excellent feedback and exceeded stakeholder expectations recently, the customer decides that there is no need to continue...
- Question #298
i program with six projects has been running for three years. The company's procurement and contracts department has compiled a qualified seller list. The program manager determine...
- Question #299
An ice cream company wants to introduce a new flavor to a new market. The executive sponsor requests a sampling for the test market and the sample group provides negative feedback....
- Question #300
After new private equity owners acquire an enterprise, they want to improve its value by reducing costs. A new program will restructure the enterprise, including an aging headquart...