BICSI
RCDD-002 · Question #295
Exhibit: In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?
The correct answer is A. Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of. See the full explanation below for the reasoning.
Question
Exhibit:
In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?
Exhibit
Options
- AInstalled one or two pair cables from the boat slips to a distribution terminal on the closest point of
- BPlace distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Install
- CPre-cable each boat slip during construction.
- DFor security, each install should be terminated in the patch panel/cross-connect at the
How the community answered
(41 responses)- A76% (31)
- B7% (3)
- C15% (6)
- D2% (1)
Community Discussion