Exhibit: In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
The correct answer is A. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run. See the full explanation below for the reasoning.
Question
Exhibit:
In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
Exhibit
Options
- APlace distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run
- BProvide one or two pair cables from the boat slips to a distribution terminal on the closest point of
- CPre-cable each boat slip during construction.
- DFor security, each run should be terminated in the patch panel/ cross-connect at the dockmaster
How the community answered
(29 responses)- A79% (23)
- B10% (3)
- C7% (2)
- D3% (1)
Community Discussion