An equipment reseller with limited manufacturing capacity is introducing a new product line that requires a custom fabricated part. Which of the following would be the FIRST action that should be taken to obtain the custom part?

Options

  • ASubmit an RFI to a local manufacturing facility
  • BPerform a make or buy analysis
  • CCreate an RFP to be sent out to current product vendors
  • DDevelop detailed drawings and submit to manufacturing for production