Question

Which of the following are characteristics of a projects critical path? (Select Two).

Options

  • AThe critical path is the longest duration.
  • BThe critical path has the least amount of resources.
  • CThe critical path is the shortest duration.
  • DThe critical path has less than or equal to zero float time.
  • EThe critical path has a greater than zero float time.