Reviewing the results of a control chart, the project manager finds the production samples had results inside both the upper control limit and the lower control limit. Which of the following is the…
The correct answer is D. The project manager should continue following the existing process, including the measuring of. See the full explanation below for the reasoning.
Question
Reviewing the results of a control chart, the project manager finds the production samples had results inside both the upper control limit and the lower control limit. Which of the following is the BEST course of action for the project manager based on this information?
Options
- AThe project manager should identify potential new production teams to obtain different results.
- BThe project manager should create a report to outline the results for client review and request a
- CThe project manager should stop production until the processes are reviewed in full for
- DThe project manager should continue following the existing process, including the measuring of
How the community answered
(29 responses)- A14% (4)
- B3% (1)
- C7% (2)
- D76% (22)