A key stakeholder changed the specifications and the testing criteria for the product. The finished product was defective and unacceptable to the customer. A post-mortem analysis is performed to:

The correct answer is B. document the reasons for the failure of the project. See the full explanation below for the reasoning.

Question

A key stakeholder changed the specifications and the testing criteria for the product. The finished product was defective and unacceptable to the customer. A post-mortem analysis is performed to:

Options

  • Aassess responsibility for the failure of the project.
  • Bdocument the reasons for the failure of the project.
  • Caccept the cost figures from the project.
  • Drelease the resources associated with the project.

How the community answered

(45 responses)
  • A
    2% (1)
  • B
    82% (37)
  • C
    4% (2)
  • D
    11% (5)