Question

While performing a scheduled walkthrough at a construction site, the customer points out a discrepancy. Which of the following is the FIRST step that should be taken before submitting a change control form?

Options

  • AConsult the project sponsor
  • BIdentify the change
  • CPerform a feasibility study
  • DPerform impact analysis