CSSBB Exam Questions
421 real CSSBB exam questions with expert-verified answers and explanations. Page 5 of 9.
- Question #221Measure Phase
This table displays the inventory of fasteners in a storage cabinet. A bolt is selected at random from the fastener cabinet. Find the approximate probability it is size 7/8.
conditional probabilityfrequency tableP(A|B) - Question #223Measure Phase
This table displays the inventory of fasteners in a storage cabinet. An item is selected at random from the fastener cabinet. Find the approximate probability it is a 1/2 inch bolt...
joint probabilityfrequency tableintersection probability - Question #224Measure Phase
A medicine with efficacy of .52 is given to five patients. Find the approximate probability that at least one of the patients is cured. (Hint: Use the binomial formula.)
binomial distributioncomplement ruleprobabilityat-least-one probability - Question #225Analyze Phase
A sample of size 50 from machine A has a mean of 18.2 and standard deviation 3.1. A sample of size 40 from machine B has mean 17.6 and standard deviation 2.8. Do these data indicat...
two-sample hypothesis testz-testmean comparisoninference - Question #226Analyze Phase
In problem 1, do the data indicate that the population for machine A has a larger standard deviation?
F-testvariance comparisonhypothesis testingstandard deviation - Question #227Measure Phase
This table displays the inventory of fasteners in a storage cabinet. An item is selected at random from the fastener cabinet. Find the approximate probability it is larger than 1/2...
probabilityfrequency tablecomplementary events - Question #228Analyze Phase
The average weight of castings produced at the Nebraska foundry is 3.7 lbs. A new supplier from Kansas has submitted a batch of castings known to have normally distributed weights....
one-sample t-testhypothesis testingmean comparisoninference - Question #229Organizational Process Management and Measures
Successful Six Sigma projects always:
Six Sigma fundamentalsproject selectionbottom line impactbusiness value - Question #230Control Phase
An x-bar and R chart has four part measurements per sample The control limits on the averages chart are 2.996 and 3.256. Assume the process data form a normal distribution. What is...
Xbar-R chartcontrol limitsnormal distributionprobability calculation - Question #231Analyze Phase
For a line in an FMEA form a team has established the following: Cost: $82 Severity: 7 Occurrence: 9 Detection: 4 Target date: 7 days What should the risk priority number (RPN) be...
FMEARPN calculationrisk priority numberseverity-occurrence-detection - Question #236Control Phase
A ___________ is used primarily to track the stability of the average value of a metric of interest.
Xbar-R chartSPC chart typesprocess averagevariable data - Question #237Control Phase
For her injection molding project a Belt needed to track the percentage of defectives of a particular sample set so she used a ___________ to display the data?
P chartattribute dataproportion defectiveSPC chart selection - Question #238Control Phase
Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for the process?
OCAPout-of-control action plancontrol chartspecial cause - Question #239Control Phase
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?
control chartscontrol limitsspecial cause variationShewhart - Question #240Control Phase
Common and ______________ Cause Variation are the focus of Statistical Process Control.
common cause variationspecial cause variationSPCvariation types - Question #241Control Phase
Special Cause Variation falls into which two categories?
special cause variationassignable causepattern rulesSPC - Question #242Control Phase
Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.
range chartsubgroup variationSPC chartsspecial cause detection - Question #243Control Phase
If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is...
SPC chart selectionvariable dataXbar-R chartprocess monitoring - Question #244Control Phase
When a Belt Poka-Yoke's a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early...
poka-yokemistake proofingSPC applicabilitydefect prevention - Question #245Control Phase
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critic...
response plancontrol planOCAPproject closure - Question #246Control Phase
The Control Limits width varies if the sample size varies for which type of chart?
P chartvariable control limitssample sizeattribute SPC - Question #247Improve Phase
Which of these elements are not included in Implementation plans?
implementation planwork breakdown structureproject managementImprove phase deliverables - Question #248Control Phase
Upon completion and validation of an improvement to a process a Belt and the Project Team create a Control Plan that contains which of these?
control planprocess monitoringcritical metricsstandard operating procedure - Question #249Improve Phase
What conclusion is most correct about the Experimental Design shown here with the response in the far right column?
DOE analysisfactor significanceregression outputexperimental design - Question #250Improve Phase
Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct answers).
main effects plotcoded coefficientsfactorial designDOE interpretation - Question #251Improve Phase
How many experimental runs exist in a Full Factorial and fully randomized design for 4 factors with 2 replicates for the Corner Points and no Center Points? The factors in the expe...
full factorial designexperimental runsreplicationtwo-level design - Question #252Improve Phase
If an experiment has 5 factors and no replicates for a 2-level Experimental Design with 16 experimental runs which statement is incorrect?
fractional factorialaliasingconfoundinghalf-fractional design - Question #253Improve Phase
Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis? (Note: There are 2 correct answers).
Pareto chartDOE effectsfactor significancemodel selection - Question #254Improve Phase
Fractional Factorial, ____________and Response Surface Method are types of planned experiments.
Design of ExperimentsFactorial DesignDOE typesResponse Surface Method - Question #255Improve Phase
Relative to a Design of Experiments the term ________________ refers to variables being a linear combination of each other.
Design of ExperimentscollinearityDOE terminologyregression - Question #256Improve Phase
Which statement(s) are incorrect about Fractional Factorial Designs?
Fractional Factorial DesignResolutionDOEexperimental design - Question #257Improve Phase
If in an experiment all possible variable pairs sum to zero the design is Orthogonal.
Design of ExperimentsorthogonalityDOE fundamentals - Question #258Improve Phase
Which Experimental Design typically is most associated with the fewest number of input variables or factors in the design?
Response Surface DesignDOE typesinput variablesexperimental design - Question #259Improve Phase
The method of Steepest Ascent guides you toward a target inside the original inference space.
Response Surface MethodSteepest Ascentinference spaceDOE - Question #260Improve Phase
Situations where standardized work needs to be incorporated include all of these except _____________________.
Standardized WorkLeanprocess consistencylabor efficiency - Question #261Improve Phase
The Lean toolbox includes all of these items except ________________.
Lean toolboxMistake ProofingVisual FactoryDesign of Experiments - Question #262Improve Phase
Questions that can be best answered by a Visual Factory include all of these except _____________________.
Visual FactoryLeanvisual managementworkplace organization - Question #263Control Phase
If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase...
Visual FactoryControl Phasesustaining improvementsinventory management - Question #264Improve Phase
When a Belt implements an improvement that is automated thus requiring no particular understanding for use he has applied which Lean tool?
Mistake ProofingPoka-yokeLeanautomation - Question #265Improve Phase
Kaizens or Kaikakus and Six Sigma projects are intended to create incremental process improvements versus breakthrough, significant improvements.
KaizenKaikakuSix Sigmaincremental vs breakthrough improvement - Question #266Improve Phase
Which of these items contribute to what is necessary for successful Kaizen events?
KaizenLeancontinuous improvementchange management - Question #267Improve Phase
Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a ________...
KanbanLeanpull systemflow management - Question #268Improve Phase
When a Belt decides to use written procedures and visual controls to improve the consistency of the tasks that must occur in the process he is improving he has utilized the _______...
5SStandardizingvisual controlsLean - Question #269Control Phase
SPC Charts are used extensively in different business and decision-making environments. In this example a vendor is being selected based on speed of delivery. Which of the conclusi...
SPCControl Chartsvendor selectionprocess variation - Question #270Improve Phase
Fractional Factorial designs are used to reduce the ____________ because the number of runs has been lowered.
Fractional Factorial DesignDOE efficiencyexperimental runscost reduction - Question #271Improve Phase
Fractional Factorial Designs are used to analyze factors to model the output as a function of inputs if Hypothesis Testing in the Analyze Phase was inadequate to sufficiently narro...
Fractional Factorial DesignDOEAnalyze Phasehypothesis testing - Question #272Improve Phase
A Factorial Experiment based on a Level 2 Design with 6 factors would require 16 runs to fully assess the interactions.
Full Factorial DesignDOE calculationsexperimental runs2-level design - Question #273Improve Phase
A Full Factorial experiment using a 3 level 3 factor approach has been proposed to test the viability of an extrusion machine experiment. How many treatment combinations will this...
Full Factorial Designtreatment combinations3-level designDOE calculations - Question #274Analyze Phase
Screening experiments are the proper choice when a Belt is faced with the situation of highly Fractional Factorial Designs.
screening experimentsfractional factorial designDOE - Question #275Analyze Phase
Which statement(s) are correct about the DOE Factorial plot output here? (Note: There are 3 correct answers).
factorial plotDOEfactorial designfactor levels