- Question #203
What type of software testing is most closely associated with testing after a change has been made to the software or operational software has been changed to maintain the software...
- Question #204
Which of the following is an important component of a complaint resolution process?
- Question #205
One of the reasons a quality baseline needs to be established is:
- Question #206
______________is a statement of principles, and a broad guide to action.
- Question #207
A "master list" of processes that support an organization in accomplishing its goals is known as a:
- Question #208
Internal control is not a serial process, where one component affects only the next. It is a multidirectional interactive process in which almost any component can and will influen...
- Question #209
As the type of product changes on the process maturity continuum, the work processes also change.
- Question #210
A measure is a single attribute of a product or process.
- Question #211
Quality Control implemented through verification techniques is normally performed:
- Question #212
When a computer operator verifies that the jobs to be run that day have been run is called:
- Question #213
In the context of the PDCA cycle, Work Processes represent the _____ component and the Check Processes represent the ___________component.
- Question #214
Staged models are composed of a number of distinct levels of maturity.
- Question #215
Which tool is used by teams to help create order out of chaos, by categorizing large numbers of ideas?
- Question #216
A standard must be measurable, attainable, and necessary. What is meant by 'attainable' in this context?
- Question #217
Which of the following in the COSO enterprise risk management model is the component that requires "management to select an approach or set of actions to align assessed risks with...
- Question #218
COTS software is _______ if correct results will be produced under actual business conditions.
- Question #219
Managing by process means to use processes to achieve management's desired results. In this the process performance indicators should always be:
- Question #220
The factors that need to be addressed during contract negotiations for software developed by an outside organization include the following, except for:
- Question #221
Effort required to couple one system with another is called:
- Question #222
Using the PDCA Cycle concept, defining the mission of a Quality Assurance function would be considered which PDCA phase?
- Question #223
If a software development contract includes a clause on foreign attachments, which of the following would be considered a foreign attachment?
- Question #224
If a software project produced over 100 defects, would you state:
- Question #225
Which of the following is not included in 'Failure Cost' under 'Cost of Quality'?
- Question #226
Which task or tasks are helpful in building support for quality?
- Question #227
Which type of control method does not cause interpersonal problems?
- Question #228
If you had seven programs and the size in 'function points' were 5, 10, 15, 20, 30, 40, and 90. What is the mean size of those seven programs in function points?
- Question #229
_______________ is a structured, problem-solving technique used to show the relationship between groupings.
- Question #230
Within an ISO process assessment, a capability level is said to be established 'only' and 'only if' all the process attributes are 'fully achieved'.
- Question #231
____________ Listening is when the listener is performing an analysis of what the speaker said.
- Question #232
Which type of benchmark is used to set and validate objectives to measure performance?
- Question #233
Process Improvement is most effective when it is performed by:
- Question #234
Objective of assuring that the software / COTS can be integrated into the business system work flow is to ensure that:
- Question #235
QFD can be used to provide forward and backward traceability of value in the software development life cycle.
- Question #236
Which of the following is NOT a major concerns during the operation and maintenance of a purchased application or software?
- Question #237
It is recommended that a quality assurance group should develop a charter for the group. Which of the following is not normally included in the quality charter?
- Question #238
Which of the following is a long term objective of the quality function?
- Question #239
If you had seven programs and the size in function points were 80, 20, 20, 60, 40, 50, and 150. What is the median size of those seven programs in function points?
- Question #240
Which of the following is not a planning activity?
- Question #241
A common term that is used today for contracting for software development is "performance based contracting." Performance based contracting means:
- Question #242
Which of the following would be considered a standard unit of measurement?
- Question #243
While contracting for outsourced software development, ___________ refers to the rights of the customer to run the application system in more than one location.
- Question #244
Baselines should always be based on objectively measured dat
- Question #245
If the input product to a workbench does not meet the entry criteria, it should be accepted to save time and reworked later in the process.
- Question #246
Six Sigma quality is a statistical term defining the number of defects that have been established as a quality objective. A Six Sigma defect rate is:
- Question #247
Processes containing only common causes of variation are considered stable.
- Question #248
The effort required for testing a program to insure it performs its intended function is called:
- Question #249
What technique can be used to provide structure to the ideas from a brainstorming session?
- Question #250
In the context of process maturity, 'check process continuum' moves from:
- Question #251
In the CobiT Model, defining and managing service levels, performance, problems and incidences is a component of:
- Question #252
At what process maturity level in the SEI process maturity model would you expect that the most effort would be devoted to quality control?