BICSI
RCDD-002 · Question #345
RCDD-002 Question #345: Real Exam Question with Answer & Explanation
Sign in or unlock RCDD-002 to reveal the answer and full explanation for question #345. The question stem and answer options stay visible for context.
Question
Building automation systems (BAS) cabling may include the horizontal electrical services from the electrical panel using a modular partitioned cable tray or raceway. By combining horizontal services in a common pathway and replacing the traditionally separate pathways (e.g., multiple conduit and cable tray systems) for the voice, data, video, BAS, and electrical services used in a traditional hardwired installation, it can do which two of the following? (Choose two.)
Options
- AReduce space requirements for delivering the services in the work space
- BNot reduce the labor hours for cabling and pathways
- CIncrease operational costs for MAC work
- DIncrease the margins on fill ratio for future installations
- EProvide a substantial cost reduction for the initial installation
Unlock RCDD-002 to see the answer
You've previewed enough free RCDD-002 questions. Unlock RCDD-002 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.