Question

A user has entered planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a product. For the coming months, requirements with requirement type LSF (derived from the main strategy 10) have been planned. The user would like to change the requirement type from LSF to VSF planning with final assembly (in accordance with planning strategy 40) for requirements in the production plan that have already been saved. Which of the following statements are applicable in this case? (Choose two.)

Options

  • AThe user has to change the requirement type for planning strategy 10 to VSF planning with final
  • BThe present requirement for the product can be changed manually from LSF to VSF in the
  • CThe user can enter the new planning strategy group 40 in the material master of the product,
  • DThe planning strategy group can be changed from 10 to 40 in the existing production plan, and

Unlock C_TSCM42_65 to see the answer