600-455 · Question #42

Which statement about when you deploy Cisco Unified CCE on UCS B/C Tested Reference Design TRC servers where each physical CPU core is mapped 1-1 with a vCPU is true?

The correct answer is B. You cannot overload/over-subscribe the vCPU/cores on the UCS servers even if you do not over-. See the full explanation below for the reasoning.

Question

Which statement about when you deploy Cisco Unified CCE on UCS B/C Tested Reference Design TRC servers where each physical CPU core is mapped 1-1 with a vCPU is true?

Options

  • AYou can overload/over-subscribe the vCPU/cores on the UCS servers as long as you do not over-
  • BYou cannot overload/over-subscribe the vCPU/cores on the UCS servers even if you do not over-
  • CYou can overload/over-subscribe the vCPU/cores on the UCS servers as long as the memory
  • DYou can overload/over-subscribe the vCPU/cores on the UCS servers as long as the total CPU

How the community answered

(40 responses)
  • A
    5% (2)
  • B
    70% (28)
  • C
    10% (4)
  • D
    15% (6)