SK0-003 · Question #450
When purchasing a UPS for a server room, which of the following are important factors to consider? (Select TWO).
The correct answer is C. Estimated runtime D. Maximum load. When selecting a UPS for a server room, critical considerations are the estimated runtime it can provide during an outage and the maximum electrical load it can support from connected equipment.
Question
When purchasing a UPS for a server room, which of the following are important factors to consider? (Select TWO).
Options
- ANetwork card configuration
- BRemote access procedures
- CEstimated runtime
- DMaximum load
- EPower cord length
How the community answered
(60 responses)- A5% (3)
- B8% (5)
- C85% (51)
- E2% (1)
Why each option
When selecting a UPS for a server room, critical considerations are the estimated runtime it can provide during an outage and the maximum electrical load it can support from connected equipment.
Network card configuration relates to network devices or servers, not a primary factor for UPS selection itself, although some UPS units have network management cards for monitoring.
Remote access procedures relate to IT operations and management, not a characteristic or factor for selecting the physical UPS hardware.
Estimated runtime is crucial for a UPS as it dictates how long servers can remain operational during a power outage, allowing for graceful shutdown or generator activation.
The maximum load, or VA/Watt capacity, of a UPS must exceed the total power consumption of all connected devices to ensure it can adequately power them without overloading.
Power cord length is a minor practical detail for placement, not a primary technical factor for the UPS's core function or capacity requirements.
Concept tested: UPS selection criteria
Source: https://www.apc.com/us/en/faqs/FA280970/