Question

Which of the following are true about the length of the Sprint? (choose the best answer)

Options

  • AThe length of the Sprint should be proportional to the work that is done in between
  • BAll Sprints must be one month or less.
  • CSprint length is determined during Sprint Planning, and should hold the time it will
  • DSprint length is determined during Sprint Planning, and should be long enough to