nerdexam
Microsoft

MB-335 · Question #160

Drag and Drop Question A manufacturing company is implementing Dynamics 365 Supply Chain Management. You have a bill of materials (BOM) for each finished good. Finished goods may have subcontracted op

The correct answer is Phantom BOM; Vendor line type. Dynamics 365 SCM - BOM Line Configuration The question presents two requirements (implied by the two answer slots). Based on the correct arrangement, here's what maps to what: --- Requirement 1: Finished good must be exploded automatically when a user views its BOM Answer: Phanto

Configure products

Question

Drag and Drop Question A manufacturing company is implementing Dynamics 365 Supply Chain Management. You have a bill of materials (BOM) for each finished good. Finished goods may have subcontracted operation steps. When a user views a BOM for a finished good, the finished good must be exploded automatically. You need to configure the BOM lines. What should you configure? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point. Answer:

Exhibit

MB-335 question #160 exhibit

Answer Area

Drag items

BOM versionPhantom BOMVendor line typePegged supply line type

Correct arrangement

  • Phantom BOM
  • Vendor line type

Explanation

Dynamics 365 SCM - BOM Line Configuration

The question presents two requirements (implied by the two answer slots). Based on the correct arrangement, here's what maps to what:


Requirement 1: Finished good must be exploded automatically when a user views its BOM

Answer: Phantom BOM

A Phantom BOM (Phantom line type) tells the system to treat a subassembly as transparent - it has no physical stocked existence in the BOM hierarchy. When a user views the parent finished good's BOM, the phantom subassembly is automatically exploded (expanded inline) into its raw components. This is by design: phantoms are never picked or stored; they exist only to organize the BOM visually while the system treats their children as direct components of the parent. This directly satisfies the "exploded automatically" requirement.


Requirement 2: Finished goods may have subcontracted operation steps

Answer: Vendor line type

The Vendor line type on a BOM line signals that the item or operation at that step is outsourced to an external vendor (subcontractor). Dynamics 365 uses this to generate purchase orders or subcontracting purchase agreements for those steps during production order processing. It's the correct mechanism for modeling subcontracted work within a BOM.


Why the other options are wrong

OptionWhy it doesn't fit
BOM versionManages effective dates and approval states for entire BOMs - not a BOM line type and does not control explosion or subcontracting.
Pegged supply line typeTies supply directly to a specific demand (hard pegging) - used for supply reservation, not for automatic explosion or subcontracting.

Common Mistakes

  • Confusing Phantom with multilevel BOMs generally. All multi-level BOMs can be exploded manually, but only the Phantom line type triggers automatic explosion on view.
  • Using routing for subcontracting instead of BOM lines. While subcontracting can also appear in routing operations, the question asks specifically about BOM line configuration, making Vendor line type the correct answer here.
  • Selecting Pegged supply because it sounds like it "attaches" something - it does, but to supply/demand pairing, not to subcontracting.

Topics

#BOM lines#phantom BOM#vendor line type#subcontracting

Community Discussion

No community discussion yet for this question.

Full MB-335 Practice