- Question #54
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you...
- Question #55
What repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and thus generate Run Schedule Quantities (RSQ) from normal planned orders? (Choos...
- Question #57
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?
- Question #58
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)
- Question #59
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)
- Question #60
Which of the following master data do you need to provide for process manufacturing? (Choose three.)
- Question #61
In your company planning strategies are used in the SAP-ECC demand management that is based on consumption. Which of the following statements about consumption is true? (Choose two...
- Question #62
In production order processing, for which of the following objects can you enter a confirmation? (Choose three.)
- Question #63
Which types of objects can be changed with Engineering Change Management? (Choose three.)
- Question #64
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final as...
- Question #65
Which of the following statements about the SAP Solution Manager listed is correct?
- Question #67
In what order are the individual steps of material requirements planning performed in SAP ECC?
- Question #68
Which of the following master data is mandatory for production order processing, when material reservations and capacity requirements for operations should be generated automatical...
- Question #69
SAP C_TSCM42_64 Exam In the course of a customer project, you are confronted with an SAP ECC system that shows the error message displayed below when you test requirements planning...
- Question #70
What does SAP ERP mean?
- Question #71
Which of the following statements is true for the simulation mode in the context of material requirements planning in SAP ECC?
- Question #72
Which of the following features are offered by MRP Areas (Material Requirements Planning Areas)? (Choose two.)
- Question #73
A supply chain planning run is to be carried out in the SAP ECC system as an example. What would be the most effective sequence in which to run through the planning modules?
- Question #74
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally...
- Question #75
SAP C_TSCM42_64 Exam Which of the following efforts can be minimized using the KANBAN procedure?
- Question #76
In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-based planning only, the planning table is to be used to plan this...
- Question #77
Which functions lead to a reduction in the capacity requirement for an individual operation at a work center? (Choose three.)
- Question #78
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
- Question #79
The company you advise wants to control the availability check in so that when a production SAP C_TSCM42_64 Exam and/or process order is created, the following receipts or issues a...
- Question #80
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?
- Question #82
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)
- Question #83
SAP C_TSCM42_64 Exam Which production order function can no longer be carried out after the order is released?
- Question #84
Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released?
- Question #85
A project team member analyzes the following situation in SAP ECC in the stock/requirements list for a finished product: there is only one customer order and one fixed planned orde...