Which two validations will be completed for the PCCE production deployment model on an ESXi server? (Choose two.)
The correct answer is C. The lab is deployed properly. E. Correct RAM and CPU are being deployed. When deploying PCCE (Packaged Contact Center Enterprise) in a production model on ESXi, the deployment tooling validates that the lab environment is properly deployed (C) - confirming the foundational infrastructure is correctly staged before production promotion - and that the…
Question
Which two validations will be completed for the PCCE production deployment model on an ESXi server? (Choose two.)
Options
- ALinux verification for containers.
- BThe hypervisor provides enough power.
- CThe lab is deployed properly.
- DEnsure that the correct servers are on the correct sides.
- ECorrect RAM and CPU are being deployed.
How the community answered
(62 responses)- A3% (2)
- B2% (1)
- C89% (55)
- D6% (4)
Explanation
When deploying PCCE (Packaged Contact Center Enterprise) in a production model on ESXi, the deployment tooling validates that the lab environment is properly deployed (C) - confirming the foundational infrastructure is correctly staged before production promotion - and that the correct RAM and CPU resources are allocated (E), since PCCE has strict virtualization resource requirements on ESXi hosts.
Why the distractors are wrong:
- A is incorrect because PCCE runs on Windows-based virtual machines, not Linux containers - Linux/container validation is not part of the PCCE ESXi deployment checklist.
- B is incorrect because "power" is an electrical/physical concern, not a software deployment validation; resource checks focus on compute (CPU/RAM) and storage, not wattage.
- D is incorrect because while side A/side B server placement matters in duplex Unified CM deployments, it is not one of the two specific validations performed by the PCCE production deployment model on ESXi.
Memory tip: Think "Lab + Resources" - PCCE first confirms your lab is stood up correctly, then confirms your VM has enough horsepower (RAM/CPU). Both are checks the deployment tool performs automatically before allowing a production promotion on ESXi.