Fill in the blank with the appropriate term. ________________ is the process, policies, and procedures related to preparing for recovery or continuation of technology infrastructure critical to an…

The correct answer is B. Cold site. Option B (Cold site) is correct because a cold site is a backup facility that provides only the basic infrastructure - power, cooling, and connectivity - but contains no pre-installed equipment or data, making it the most minimal and least ready form of disaster recovery site…

Incident Response and Business Continuity

Question

Fill in the blank with the appropriate term. ________________ is the process, policies, and procedures related to preparing for recovery or continuation of technology infrastructure critical to an organization after a natural or human-induced disaster. Answer: Disaster recovery

Options

  • AWarm site
  • BCold site
  • CHot site
  • DOff site

How the community answered

(61 responses)
  • A
    7% (4)
  • B
    89% (54)
  • C
    3% (2)
  • D
    2% (1)

Explanation

Option B (Cold site) is correct because a cold site is a backup facility that provides only the basic infrastructure - power, cooling, and connectivity - but contains no pre-installed equipment or data, making it the most minimal and least ready form of disaster recovery site. A warm site falls between cold and hot - it has some pre-installed hardware and may have periodic data backups, but still requires configuration time before it's fully operational, so it doesn't match a bare-minimum setup. A hot site is essentially a mirror of the primary facility, fully equipped and operational with near-real-time data replication, enabling near-immediate failover - the opposite of cold. Off site is a general term referring to any location separate from the primary facility (including backups or archives), not a specific tier of disaster recovery readiness.

Memory tip: Think temperature = readiness. Cold = frozen/not ready (bring your own equipment), Warm = thawing/partially ready, Hot = fully running. The colder the site, the cheaper it is but the longer it takes to recover.