You are advising a school district on disaster recovery plans. In case a disaster affects the main IT centers for the district they will need to be able to work from an alternate location. However…

The correct answer is B. Cold site. A cold site is the most budget-appropriate choice for a school district because it provides a basic alternate facility (power, network infrastructure, empty floor space) without pre-installed hardware or active systems - keeping costs minimal while still enabling recovery…

Network Security Policy and Management

Question

You are advising a school district on disaster recovery plans. In case a disaster affects the main IT centers for the district they will need to be able to work from an alternate location. However, budget is an issue. Which of the following is most appropriate for this client?

Options

  • AWarm site
  • BCold site
  • CHot site
  • DOff site

How the community answered

(38 responses)
  • A
    5% (2)
  • B
    79% (30)
  • C
    13% (5)
  • D
    3% (1)

Explanation

A cold site is the most budget-appropriate choice for a school district because it provides a basic alternate facility (power, network infrastructure, empty floor space) without pre-installed hardware or active systems - keeping costs minimal while still enabling recovery operations when needed.

Why the distractors are wrong:

  • A. Warm site - has some pre-configured hardware and partially active systems, making it faster to activate than a cold site but significantly more expensive to maintain.
  • C. Hot site - is a fully operational mirror of the primary site, ready for immediate failover; it's the most expensive option and far exceeds a budget-constrained district's needs.
  • D. Off site - refers to off-site data/backup storage, not a recovery facility; it doesn't address the need for an alternate working location.

Memory tip: Think of the temperature as representing both readiness and cost - Hot = instantly ready and expensive, Warm = partially ready and moderate cost, Cold = not ready but cheapest. When budget is the constraint, go Cold.

Topics

#disaster recovery planning#recovery site types#business continuity#cost optimization