300-615 · Question #280
Refer to the exhibit. An engineer noticed that after the initial Cisco APIC fabric discovery, the cluster is flapping between fully fit and degraded. Which connection must be established to resolve…
The correct answer is A. Eth1/49 on SWLAN3MET to ETH2-1. ACI leaf FEX modules must uplink to each leaf switch in the pair: port ETH2-1 should go to SWLAN3MET and ETH2-2 to SWLAN4MET. In the current wiring, SWLAN3MET is on ETH2-2, so moving SWLAN3MET's Eth1/49 over to ETH2-1 restores the proper one-to-one FEX-to-leaf mapping and stops…
Question
Refer to the exhibit. An engineer noticed that after the initial Cisco APIC fabric discovery, the cluster is flapping between fully fit and degraded. Which connection must be established to resolve the issue?
Exhibits
Options
- AEth1/49 on SWLAN3MET to ETH2-1
- BEth1/50 on SWLAN4MET to ETH2-2
- CEth1/50 on SWLAN3MET to ETH2-1
- DEth1/49 on SWLAN4MET to ETH2-3
How the community answered
(38 responses)- A71% (27)
- B18% (7)
- C3% (1)
- D8% (3)
Explanation
ACI leaf FEX modules must uplink to each leaf switch in the pair: port ETH2-1 should go to SWLAN3MET and ETH2-2 to SWLAN4MET. In the current wiring, SWLAN3MET is on ETH2-2, so moving SWLAN3MET's Eth1/49 over to ETH2-1 restores the proper one-to-one FEX-to-leaf mapping and stops the degraded/fully-fit flap.
Topics
Community Discussion
No community discussion yet for this question.

