Refer to the exhibit. A network engineer is troubleshooting a Cisco Nexus 5000 Series Switch. The interface between the server and the switch is nonoperational and is expected to operate at 10 Gbps…

The correct answer is A. Configure pause error-disable recovery. N5K_Troubleshooting_Guide/n5K_ts_fcoe.html

Network

Question

Refer to the exhibit. A network engineer is troubleshooting a Cisco Nexus 5000 Series Switch. The interface between the server and the switch is nonoperational and is expected to operate at 10 Gbps. The drain rate of the interface is 3 Mbps. Which action resolves the issue?

Exhibits

300-615 question #122 exhibit 1
300-615 question #122 exhibit 2

Options

  • AConfigure pause error-disable recovery
  • BEnable link level pause on the interface
  • CReset priority flow counters
  • DSet priority flow control pause

How the community answered

(67 responses)
  • A
    75% (50)
  • B
    7% (5)
  • C
    3% (2)
  • D
    15% (10)

Explanation

N5K_Troubleshooting_Guide/n5K_ts_fcoe.html