CompTIACompTIA
SK0-005 · Question #667
SK0-005 Question #667: Real Exam Question with Answer & Explanation
Sign in or unlock SK0-005 to reveal the answer and full explanation for question #667. The question stem and answer options stay visible for context.
Server hardware installation and management
Question
A data center has redundant networks. HVAC. and power to provide redundancy at all levels. A newly installed server lost power during an outage on one of the power providers, while all other servers remained online. Which of the following most likely caused the server to lose power?
Options
- AThe server power supplies were connected to the same electrical circuit.
- BThe HVAC system malfunctioned, causing higher temperatures in the data center.
- CThe power outage caused the networks to fail.
- DThe server overheated due to the power outage.
Unlock SK0-005 to see the answer
You've previewed enough free SK0-005 questions. Unlock SK0-005 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
Topics
#Power redundancy#Server power management#Data center infrastructure#Hardware installation best practices