Question

A server with redundant power supplies connected to two different UPS units fails to gracefully shut down during a power outage. A technician has verified cables and both UPS units are properly connected. Which of the following hardware tools should the technician use to further troubleshoot this issue?

Options

  • ALoad tester
  • BOTDR
  • CLoopback plug
  • DCrimper