SK0-004 · Question #203
A company has hired a consultant to review the production storage infrastructure and provide suggestions on improving performance. The consultant has identified a bottleneck in the production…
The correct answer is B. Establish a plan of action to implement the solution in production. After successfully lab-testing a solution, best practice in change management requires establishing a formal plan of action before touching production systems.
Question
A company has hired a consultant to review the production storage infrastructure and provide suggestions on improving performance. The consultant has identified a bottleneck in the production switching fabric and successfully tested the solution in a lab environment. Which of the following should the consultant perform NEXT, according to best practices?
Options
- AImplement the solution in production since it was tested in the lab.
- BEstablish a plan of action to implement the solution in production.
- CPerform a root cause analysis of what caused the bottleneck.
- DEstablish a theory describing the possible issue in the production network.
How the community answered
(34 responses)- A3% (1)
- B74% (25)
- C15% (5)
- D9% (3)
Why each option
After successfully lab-testing a solution, best practice in change management requires establishing a formal plan of action before touching production systems.
Implementing directly in production without a formal plan violates change management best practices because production environments carry risks and dependencies not present in a lab, regardless of successful lab testing.
The standard change management process requires a formal plan of action after lab validation and before any production implementation. This plan covers the change window, rollback procedures, stakeholder notification, and risk assessment - safeguards that lab testing alone does not address.
Root cause analysis is an earlier troubleshooting step used to identify the underlying cause of the bottleneck - this has already been completed by the time the consultant reaches the testing phase.
Establishing a theory of probable cause is one of the first steps in troubleshooting and is already completed well before lab testing occurs.
Concept tested: Change management plan before production implementation