What steps are required to create a parallel set of table load operations from already created data flows?

The correct answer is B. Open a control flow and move a parallel process to a blank space in the flow; then drag the. See the full explanation below for the reasoning.

Question

What steps are required to create a parallel set of table load operations from already created data flows?

Options

  • AOpen a data flow and move a parallel process to a blank space in the flow; then drag the desired
  • BOpen a control flow and move a parallel process to a blank space in the flow; then drag the
  • COpen a control flow and place all of the data flows on the canvas; connect the 'success' port of
  • DPut all the data flows into one data station and create a control flow.

How the community answered

(62 responses)
  • A
    6% (4)
  • B
    76% (47)
  • C
    13% (8)
  • D
    5% (3)

Community Discussion

No community discussion yet for this question.

Full P2090-027 Practice