nerdexam
IBM

P2090-027 · Question #10

P2090-027 Question #10: Real Exam Question with Answer & Explanation

Sign in or unlock P2090-027 to reveal the answer and full explanation for question #10. The question stem and answer options stay visible for context.

Question

In a control flow, the Start operator has an on-failure port. When are any operators linked to that port executed?

Options

  • AIf there is an error starting the control flow.
  • BAt the end of a control flow, if there were any on-failure actions processed by any control flow
  • CEach time an on-failure action is processed by a control flow operator.
  • DOnly after designated control flow operators process on-failure actions.

Unlock P2090-027 to see the answer

You've previewed enough free P2090-027 questions. Unlock P2090-027 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full P2090-027 Practice