You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup: - The setup uses a Lean schedule group with a…
Sign in or unlock MB-335 to reveal the answer and full explanation for question #271. The question stem and answer options stay visible for context.
Question
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup:
- The setup uses a Lean schedule group with a throughput ratio = 2.
- The process activity tied to production flow has the following
runtime activity times: time = 3 min, per quantity = 1.
- The work cell capacity has a model type of Throughput and an average
throughput quantity of 60 per a capacity period of standard workday (8 hour day).
- The throughput is 10 per hour.
You need to set up a Discrete operation to mirror the item’s production flow activity. What should you do?
Options
- ACreate a route with a runtime = 1, a process quantity = 10, and the operation's hours/time = 1.
- BCreate a route with a runtime = 1, a process quantity = 1, and the operation's hours/time = 0.0167
- CCreate a route with a runtime = 10, a process quantity = 6, and the operation's hours/time = 1.
- DCreate a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 1.
Unlock MB-335 to see the answer