nerdexam
Microsoft

MB-335 · Question #102

A company produces multiple products that require an installation kit that includes 50 components. The company does not want to include these 50 components in every Bill of materials (BOM). You have…

The correct answer is D. Change the line type to Phantom. You've hit your limit · resets 4am (America/New_York)

Configure products

Question

A company produces multiple products that require an installation kit that includes 50 components. The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order. You need to set up the product BOM for the finished good. What should you do?

Options

  • AChange the coverage group on the kit item to Manual.
  • BSelect Phantom on the engineering fast tab on the kit item.
  • CChange the line type to Pegged supply.
  • DChange the line type to Phantom.

How the community answered

(19 responses)
  • A
    5% (1)
  • B
    16% (3)
  • C
    5% (1)
  • D
    74% (14)

Explanation

You've hit your limit · resets 4am (America/New_York)

Topics

#Bill of Materials#phantom line type#kit components#BOM configuration