Referring to the exhibit, which hardware change would be made to the IP Fabric to ensure an exact 4:1 oversubscription ratio?

The correct answer is D. Add a spine node to the IP Fabric. Leaf = 480 Gbps southbound, 80 Gbps northbound; 480/80 = 6:1 Add a spine and northbound guide/brocade-dc-fabric-architectures-sdg/GUID-A0E2AF7F-C47A-458D-989A- 35EC97E262DD.html

Data center routing and switching technologies

Question

Referring to the exhibit, which hardware change would be made to the IP Fabric to ensure an exact 4:1 oversubscription ratio?

Exhibit

JN0-680 question #37 exhibit

Options

  • AUpgrade the fabric links to 100GbE.
  • BAdd two leaf nodes to the IP Fabric.
  • CAdd three leaf nodes to the IP Fabric.
  • DAdd a spine node to the IP Fabric.

How the community answered

(35 responses)
  • A
    6% (2)
  • B
    17% (6)
  • C
    6% (2)
  • D
    71% (25)

Explanation

Leaf = 480 Gbps southbound, 80 Gbps northbound; 480/80 = 6:1 Add a spine and northbound guide/brocade-dc-fabric-architectures-sdg/GUID-A0E2AF7F-C47A-458D-989A- 35EC97E262DD.html