HP
HPE7-A06 · Question #85
HPE7-A06 Question #85: Real Exam Question with Answer & Explanation
Sign in or unlock HPE7-A06 to reveal the answer and full explanation for question #85. The question stem and answer options stay visible for context.
Question
Refer to the exhibit. Acme Corp has VM workload running from ToR-1, and has noticed performance degradation. They suspect ToR-1 uplinks are periodically overutilized. List valid reasons why ToR-1 uplinks are being overutilized based on the diagram. (Choose two.)
Exhibit
Options
- AThe customer has used the default MSTP region configuration.
- BCore-1 and Core-2 are not running the same firmware.
- CThe VLAN to instance mapping is not the same on all switches.
- DCore-2 has been incorrectly configured as the root bridge.
- EToR-1 uplinks and downlinks are both running spanning-tree port-type admin-network.
Unlock HPE7-A06 to see the answer
You've previewed enough free HPE7-A06 questions. Unlock HPE7-A06 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
