In preparation for the deployment, what statement is correct from the below?

The correct answer is D. Migrate Layer 2 functionality (e.g., VLAN tagging on uplinks) then cut over to Layer 3 function. D is correct because network migration must follow the OSI model's logical dependency: Layer 3 (routing/IP) cannot function without Layer 2 (switching/VLANs) being in place first. Migrating L2 (VLAN tagging, uplinks) first, then cutting over L3 (routing) ensures each layer is…

Validating and Documenting Data Center Designs

Question

In preparation for the deployment, what statement is correct from the below?

Options

  • AIt is best if you migrate Layer 2 functionality (e.g., VLAN tagging on uplinks) and Layer 3 function
  • BIf you have spent good time on your design, there is no need to have any rollback plan
  • CIt is not best practice to build the new network in parallel to the existing network
  • DMigrate Layer 2 functionality (e.g., VLAN tagging on uplinks) then cut over to Layer 3 function

How the community answered

(36 responses)
  • A
    3% (1)
  • B
    6% (2)
  • C
    3% (1)
  • D
    89% (32)

Explanation

D is correct because network migration must follow the OSI model's logical dependency: Layer 3 (routing/IP) cannot function without Layer 2 (switching/VLANs) being in place first. Migrating L2 (VLAN tagging, uplinks) first, then cutting over L3 (routing) ensures each layer is validated before the next depends on it - reducing risk and simplifying troubleshooting.

Why the distractors fail:

  • A is wrong because it implies migrating L2 and L3 simultaneously, which is risky and makes it harder to isolate failures during cutover.
  • B is dangerously wrong - a rollback plan is always required, regardless of design quality. Execution can fail even with a perfect design, and without a rollback you have no recovery path.
  • C is the opposite of best practice. Building the new network in parallel to the existing one is best practice - it lets you test and validate before cutting over, minimizing downtime.

Memory tip: Think "OSI order = migration order." You build Layer 2 before Layer 3 in the OSI model, so you migrate L2 before L3 in deployment. If you remember that L3 rides on top of L2, the sequence becomes obvious.

Topics

#migration planning#Layer 2 Layer 3 migration#deployment strategy#cutover sequencing