nerdexam
HP

HPE6-A49 · Question #4

HPE6-A49 Question #4: Real Exam Question with Answer & Explanation

Sign in or unlock HPE6-A49 to reveal the answer and full explanation for question #4. The question stem and answer options stay visible for context.

Question

Refer to the exhibit. An architect needs to design the topology for a new wired network at a campus with three buildings. The exhibit above shows the cabling layout. The customer requires link redundancy at all layers, up to one switch-to-switch link can fail without an effect on client connectivity. The architect has determined that the closet of each floor should have three Aruba 2930M switches, and the core will use Aruba 5406 switches. The aggregation layer, if used, will use Aruba 3810M switches. However, the customer prefers the elimination of the aggregation layer and has asked the architect to advise the impact of the elimination of this layer. Where would the elimination of the aggregation layer require rewriting?

Exhibit

HPE6-A49 question #4 exhibit

Options

  • AAll of the buildings
  • BBuilding 1 and Building 2 only
  • CBuilding 1 and Building 3 only
  • DBuilding 3 only

Unlock HPE6-A49 to see the answer

You've previewed enough free HPE6-A49 questions. Unlock HPE6-A49 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full HPE6-A49 Practice