HP
HPE6-A49 · Question #45
HPE6-A49 Question #45: Real Exam Question with Answer & Explanation
The correct answer is B. Add two aggregation switches in the Floor 1 closet. Connect the switch stack for each closet to C. Combine the nine switches on all three floors into a single switch stack with stacking cables in a. See the full explanation below for the reasoning.
Question
Refer to the exhibit. A customer needs a wired upgrade for a building on its main campus. The exhibit shows the switches that architect has selected for each closet and the existing cabling. The customer is not open to changing the cabling. The customer requires link redundancy for the uplinks from each closet and for the links from the building to the core. In non link failure situations, the uplinks from each closet must support at least 20 Gbps, and the building as a whole must have at least 20 Gbps to the core in non link failure situations. Which options for connecting the closets to the network core are valid? (Select two.)
Exhibit
Options
- AConnect the switch stack on each floor directly to the network core on two fiber connections per
- BAdd two aggregation switches in the Floor 1 closet. Connect the switch stack for each closet to
- CCombine the nine switches on all three floors into a single switch stack with stacking cables in a
- DCombine the nine switches on all three floors into a single switch stack with the MM OM3 fiber
- EConnect the Floor 2 switch stack to Floor 1 with two fiber connections. Do the same for Floor 3.
Community Discussion
No community discussion yet for this question.